History

1951May
The Kansai Electric Power Company, Incorporated launches its Load Dispatch Department
1952July
Becomes the first power company in Japan to start 275 kV super-high voltage power transmission
1962February
Introduced 220 kV interconnected power system (Himeji–Okayama) with Chugoku Electric Power
1963November
Introduced 275 kV interconnected power system (Johana) with Hokuriku Electric Power
1968February
Began full-fledged operation of an automatic power feeding system at the Central Load Dispatching Center
1973June
Began operation of a second automatic power feeding system at the Central Load Dispatching Center
1976May
Completes the 500 kV basic system, and starts operation of the 500 kV power system
1980February
Introduced 500 kV interconnected power system (Seibu–Minami Kyoto) with Chubu Electric Power
March
Introduced 500 kV interconnected power system (Seiban–Higashi Okayama) with Chugoku Electric Power
1989April
Introduced an automated system for power distribution
1995June
Began operation of a high-performance system at the Central Load Dispatching Center
1997June
Introduced 500 kV interconnected power system (Echizen–Reinan) with Hokuriku Electric Power
September
Completes a 500 kV crossed dual trunk line system
1999November
Began research on smart meters
2000March
Began the electric power retail consignment service
June
Began operation of the Kii Channel HVDC System
2001June
Introduced the 500kV interconnected with Chugoku Electric Power dual trunk line system
2002June
Introduces an advanced automated system for power distribution
2008April
Began verification tests for smart meters
June
Began operation of a wide-area distribution system at the Central Load Dispatching Center and Grid Operation Center
2014February
Began remote monitoring and control of the 500 kV electrical stations
April
Began the full-scale installation of smart meters
2017December
Changed the southern area 500 kV systems into loop systems
2018June
Sets up Transmission and Distribution Company (internal company)
2019April
Establishes a preparatory company for the corporate splitting of the general power transmission and distribution business
2020April
Start of phase 3 of the Electricity Sector Reforms (legal structural separation of power transmission and distribution business)
Split power transmission and distribution business from Kansai Electric Power Company and Continued as Kansai Transmission and Distribution